Case Studies

The Leadenhall Building London AKA the Cheesegrater

Installation of epoxy resin anti-slip system to loading bay and carpark.

The Bluebird Chelsea

Kitchen installation of acrylic resin flooring system

Waddington Novolex

850m² of factory floor repairs and high build epoxy resin installation.

Thames Water | Water Treatment Facility

High build epoxy resin floor installation

The Reform Club | 104 Pall Mall, London

Installation of anti-slip boards

100 Wardour Street, London

Refurbishment of kitchen floor

Amazon Fulfillment Centre

Anti-slip coating for dock levellers

Herschel car park, Slough – 8500m² of deck

Application of 3-coat system car park deck

Kirkman & Jourdain for Cokenach Estate, Barkway, Near Royston Herts.

Seamless, hygienic flooring installation for cold room store

Robex epoxy high build resin applied to new warehouse floor

RXEP Hi-Build 500 applied to 9500m² floor

Unistrut Limited Delta Point West Bromwich

External Cladding

10 Finsbury Square – Cycle Store Floor

RXEP Hi-Build 500

Eastbury School Canteen – Resin Flake Floor

Resin Flake Floor

WC Rowe

Wet Room Floor

Wydale Plastics

Anti-slip Walkway

Arla Dairy

Gripmaster Flooring

The Runnymede Hotel

Foodsafe Flooring

All England Lawn Tennis and Croquet Club

New epoxy flooring

CBRE – 52 Lime Street AKA the Scalpel building

Non-slip high build floor coating

Unistrut Limited Delta Point

New Walkway & Lines

The Postal Museum

Gripmaster

The Grove Hotel

Potting Shed Restaurant Concrete Flooring

Center Parcs Plant Room

New epoxy flooring

The Chelsea Harbour Hotel

New Kitchen Floor

We use cookies to ensure that we give you the best experience on our website.