7 Formation are a nationwide fit-out contractor that specialises in both internal and external build solutions. They asked Robex Contracting to look at a large warehouse project in Doncaster, which involved dealing with over 3,000 existing studs in the floor.
Materials used
RXEP Hi-build 500
Work undertaken
Once all studs had been filled with an epoxy resin, the whole floor was ground using large mechanical grinders with a vacuum attachment. Various expansion joints were recut and a flexible joint sealant installed and then the floor received two coats of solvent-free epoxy resin system.
Outcome
The client in Doncaster was delighted with the results and by how quickly the Robex team installed the new epoxy resin floor.