We were asked to prepare and coat the floor of a plant room at Center Parcs, Woburn Forest.
Materials used
RXEP Hi-Build 500
Work undertaken
The plant room floor was mechanically prepared using a diamond headed grinder with a vacuum attachment. Two coats of RXEP Hi-Build 500 were then applied by roller and the plinths coated in yellow Hi-build 500.
Outcome
This was carried out as a trial to see the results that could be expected. The team at Centre Parcs was delighted with the results and want to roll this out throughout the site.