London Heathrow Marriott Hotel

Installation of Robex Gripmaster to loading bay

Find out more about this service

Objective

If sections of the floor have failed, loading bays that are in constant use may endanger staff and obstruct the movement of trolleys and the reception of deliveries, creating a potential hazard.

Our aim was to introduce a seamless anti-slip resin flooring system that guarantees durability and long-lasting performance.

Materials Used

Gripmaster installed at 2mm fully broadcast with a 0.7-1.2 pigmented quartz

Gripmaster is an advanced flooring system that employs Methyl Methacrylate Resin (MMA) to create an ultra-strong, long-lasting solution for both pedestrian and vehicular traffic. With a rapid drying time of only 60 minutes, this system is designed to expedite the flooring process while still providing exceptional durability. Gripmaster boasts superior resistance to abrasion, impact, and chemical exposure, making it an excellent choice for high-traffic areas like industrial facilities, warehouses, and workshops. It is also highly popular in commercial settings like hotels, hospitals, laboratories, and food processing plants, thanks to its hygienic properties and easy maintenance. Available in a wide range of colours and finishes, Gripmaster provides plenty of design flexibility, allowing you to tailor your flooring to suit any aesthetic.

  • Hard-wearing
  • Seamless, hygienic finish
  • Excellent chemical resistance
  • Wide choice of colours
  • Anti-slip

Optional coving

Work Undertaken

After mechanically preparing the substrate and fixing any failed screed sections with quick repair MMA Mortar, Gripmaster Primer was applied, followed by installation of the Gripmaster Resin coat at 2mm that was fully broadcast with pigmented quartz measuring 0.7-1.2 in size. Once the loose quartz was swept and collected, two coats of MMA Sealer were added.

Challenges

The hospitality industry typically adheres to a strict timeline, and the install needed to be completed within a designated timeframe. Ideally, with the loading bay back in use by late afternoon.

Outcome

The hotel now has a remarkably resilient floor in its loading bay area that can endure the constant hustle and bustle. The installation was completed within a single day and the loading bay was operational again by 5pm, thanks to the fast-drying properties of our Gripmaster system.