Application of Robex Hi-Build at Centre Parcs in Woburn.
Materials used
Robex Hi-Build
Work undertaken
The entire floor was mechanically prepared. We then applied two coats of Robex Hi-Build 500. The concrete plinth was prepared and coated using Hi-Build in safety yellow.
Challenges
The plant room needed brightening up, the floor was also very hard to keep clean.
Outcome
Center Parcs has been left with a floor they can wash down easily. The plant room has definitely been improved and has brightened up the appearance.